CONTACT US

INFORMATION

INSTALLATION




1. SURFACE PREP

Aquamox must always be installed on a flat / level surface that is clean and dust free. Flanges are to be flush with the floor and ensure that framing is spaced at 300mm centres for wall boards.

2. MEASURE & CUT

When measuring a space always ensure you measure twice and cut once. Trimming can be done with either a craft knife or a hand saw. Ensure a straight and tidy cut for easier fitting together. Mitre join the hob edges for a cleaner finish and ensure the 5 degree fall is
toward the shower tray.

3.FIXING

Always dry fit before applying non solvent adhesive. Apply a generous 8mm bead of adhesive in lines at 100mm intervals. Adhesive can act as a self-leveller. Apply more generously to areas where required. When screwing wall board space the fixings to 300mm where the framing is located. Ensure that the washer is used.

4. CURING

The Aquamox recommended adhesive needs 30 minutes curing time before any waterproofing membrane can be applied. During this time the product must not be touched. After 30 minutes use caution when working on the area.